|
Divisions - Off-Site - Marine-Installation

Dry air panels
on aircraft carrier new piping installed to allow
for better airflow. Tubing ¼" copper and pipe ¼"
copper nickel.

Ventilation alteration
showing multiple configuration changes required
for proper fit up on marine installations

Ventilation alteration
performed for power industry. Alteration installed
newly manufactured of 316 stainless steel.

Damage Control
Alteration: manufactured lockers, aluminum and steel,
dunnage storage, OBA lockers, hose stowage, and
fan stowage.

Ventilation alteration
performed on AOE class vessels for installation
of Vessel Crew Gyms. All products aluminum 5053,
with hangers, attachments and CFM testing performed
by Advex.
|